7 Basic Steps of Building Construction Every Civil Engineer Should Know.
Seven basic steps in starting a building project when there is a player to develop a new building it is very necessary to have an idea about the stuart and end of the bilding project there may be variations as every project is unique and follows different design and construction process in general the basic steps involved in a building project are briefly explained planning the planning in building construction involves three major steps in developing the building plan to analysing the finance 3 selecting the construction team wants the site with the building project is intended to constructors chosen the expertise of engineers and architecture taken to develop the side and the building plan sometimes an appropriate size is selected as to the building layout is prepared the building plan is developed based on their own requirements and budget wants the planners in a and the finance and fore cost is estimated the structural design details the material estimate for prepared which help to derive project cost estimate to permit and insurance in building construction before starting a building construction the owner must make sure that one has necessary permits taken to start a construction and insurance or update from different sources in cities and states of construction work in that it would not from its results in project for project demolition for huge files processing insurance for the required for these tips to save your in the contractor three side preparation from here the actual construction process starts based on the site and building plan necessary excavations leveling and feeling can be undergone to prepare the site the necessary excavation for utilities power water and sanitation life temporary storage facilities are prepared mostly the votes needed to setup the utilities are prepared this is followed by inspection from the government officials 4 Foundation WhatsApp structure construction building structures for generally constructed on concrete foundations based on the soil type and water table level of the area the foundation chosen category if necessary so testing is performed to check the bearing capacity Shallow foundations are required to low rise building for high rise building foundation is employed once the foundation is selected the soil is activated to construct the foundation it is performed based on the foundation for more placed in a Foundation trenches and reinforcement is placed based on the foundation detailing design prepared in the planning stage the reinforcement works performed by the contractor restaurant chat buddy engineering charge the concrete mix power required proportion is 44 more and is secured to phone the finished Foundation five superstructure construction The superstructure is constructed once the substructure is completed generally a frame structure is developed which is wider finished with masonry walls adequate Windows and exterior doors are placed based on the building plan other works coming under this section is construction rules for citing to installation of heating ventilation and air conditioning tree providing a regular electric and model lines connection 4 provide insulation works as required to protect from wearing five provision of waterproofing to the walls sex plastering and finishing the world and surfaces said hate exterior and interior painting sex once the project is completed the contractor and backs the whole work one by one and make a point list the structural units for areas that are constructed properly they are below the quality level is listed in the plant list this is light attracted by the contractor in charge 7 warranty period once the project is completed and handover to the owner the contract specifies a warranty period within this period any defects found in building constructed must be fixed and replaced by the contractor and charged the warranty for materials and appliances are obtained from manufacturers and suppliers.